A flagship agricultural clean energy scheme formulated by the Ministry of New and Renewable Energy (MNRE) with a targeted installation of 34.8 GW of solar capacity by March 31, 2026, backed by ₹34,422 crore in central financial support. The scheme is divided into three components: Component A supports setting up decentralized ground-mounted grid-connected solar power plants (500 kW to 2 MW) on barren/fallow land with DISCOM Procurement Based Incentives (₹0.40/kWh or ₹6.60 lakh/MW/year for 5 years); Component B installs standalone off-grid solar agriculture pumps up to 7.5 HP (with 30% CFA + 30% State subsidy, 50% CFA in special regions); Component C provides solarization of grid-connected agricultural pumps (Individual Pump Solarization and Feeder Level Solarization) providing 30% CFA to enable daytime irrigation and power sale back to DISCOMs.
Your next step
Individual farmers, farmer groups, cooperatives, water user associations, and Farmer Producer Organizations (FPOs) with cultivable or barren agricultural land.
Application status: Active and extended through March 31, 2026 (targeting 34.8 GW solar capacity with ₹34,422 crore central outlay).
Apply only through your State Implementing Agency (SIA) or designated state renewable energy nodal portal (e.g. UPNEDA, HAREDA, MEDA, KREDL) listed on pmkusum.mnre.gov.in; beware of fraudulent fake portals charging advance registration fees.
Up to 60% total subsidy (30% Central Financial Assistance + 30% State Government subsidy; up to 50% CFA in North East, Hill States & Islands) for standalone solar pumps (Component B) and pump solarization (Component C), requiring only ~10% upfront farmer contribution with bank loan support
PM-KUSUM has separate components for decentralised grid-connected renewable power plants, standalone solar agriculture pumps and solarisation of grid-connected agricultural pumps. Applications and beneficiary contributions are administered through state implementing agencies. The MNRE portal published 2026 implementation and extension-related notices, so users should check the live state portal for the component and current intake. Do not assume a central application is open in every state.
Application dates
No application dates are recorded on this page.
Dates are shown as published by the issuing authority when JanKosh reviewed this page. Deadlines are often extended or set again each year.
The national portal is active, but it does not establish that a particular component is accepting new applications in every state.
Benefits and conditions
Solar agriculture support
Eligible applicants may receive component-specific financial assistance for a solar pump or other approved PM-KUSUM activity. Assistance rates, state share, farmer contribution and capacity limits depend on the component and current state notice.
Varies by component and state (One-time project assistance)
Who can apply
Meant for farmers, farmer groups, cooperatives, panchayats and farmer producer organisations.
The eligible applicant type, land or power connection conditions, capacity and contribution vary across Components A, B and C.
Apply only through the current state implementing agency or portal notice; availability is state and component specific.
Exclusions
Applicants or projects outside the selected component's state notice, technical requirements or capacity limits.
Required documents
Documents specified by the current state implementing agency; commonly requested land, identity, bank and electricity connection records depend on component.
How to apply
Modes: State implementing agency or state-designated online portal
Steps: Choose the applicable PM-KUSUM component and check whether the state implementing agency has opened applications.
Steps: Review the state notice for eligibility, capacity, beneficiary contribution and vendor requirements.
Steps: Apply through the state-designated channel and follow technical and payment verification instructions.
Confirmed timeline extension to 31.03.2026, ₹34,422 cr outlay, and revised targets for Components B & C.
Central Financial Assistance (CFA) provides 30% subsidy (up to 50% for NE/Himalayan states and Islands) for standalone solar pumps and pump solarization.
Verified benchmark cost subsidy patterns across Components A, B, and C.
Component A provides Procurement Based Incentive (PBI) of ₹0.40/kWh or ₹6.60 lakh/MW/year for 5 years to DISCOMs purchasing power from farmer solar plants.
Confirmed DISCOM PBI incentives and leasing revenue opportunities for rural landowners.
Frequently asked questions
What is the subsidy breakdown and how much does a farmer actually pay for a solar pump under PM-KUSUM Component B?
Under Component B, Central Financial Assistance (CFA) covers 30% of the benchmark pump cost (50% in North-East, Hill States, and Island UTs), and the respective State Government provides at least 30% subsidy. The farmer pays the remaining 40%, of which up to 30% can be financed through bank loans, meaning the farmer often needs to deposit only about 10% of the pump cost upfront.
How do farmers apply for PM-KUSUM and avoid fraudulent websites?
Farmers must apply exclusively through their designated State Implementing Agency (SIA) or State Renewable Energy Development Agency portal (such as HAREDA in Haryana, UPNEDA in UP, MahaUrja in Maharashtra) listed on the official MNRE portal (pmkusum.mnre.gov.in). MNRE has warned that no central registration fee is charged directly online and cautions against fraudulent private websites.
Can a farmer earn money by selling solar electricity under PM-KUSUM?
Yes. Under Component A (small solar plants of 500 kW–2 MW) and Component C (Individual Pump Solarization or Feeder Level Solarization), farmers can sell surplus solar power back to their local distribution company (DISCOM) at a pre-determined feed-in tariff under long-term 25-year Power Purchase Agreements (PPAs).