Central government scheme

Jal Jeevan Mission — Har Ghar Jal

Also known as Jal Jeevan Mission

A transformative Centrally Sponsored Scheme announced on August 15, 2019, and restructured by the Union Cabinet on March 10, 2026, as Jal Jeevan Mission 2.0 with an extended timeline through December 2028 and an enhanced total outlay of ₹8.69 lakh crore (comprising central assistance of ₹3.59 lakh crore). Implemented by the Department of Drinking Water and Sanitation in partnership with State Governments, JJM aims to ensure universal access to safe and adequate drinking water through Functional Household Tap Connections (FHTC) providing at least 55 litres per capita per day (lpcd) of potable water adhering to BIS:10500 standards to every rural household. JJM 2.0 prioritizes long-term service delivery, drinking water governance, source sustainability, water quality monitoring through field testing kits (FTKs) and NABL-accredited labs, the 'Sujalam Bharat' source-to-tap digital platform, and community ownership through Village Water and Sanitation Committees (VWSCs) / Pani Samitis under 'Jal Arpan'.

Your next step

All rural households across India lacking a functional piped drinking water tap connection.

Application status: Active and restructured under Jal Jeevan Mission 2.0 (extended through December 2028 with an enhanced outlay of ₹8.69 lakh crore).

Contact your local Gram Panchayat, Village Water and Sanitation Committee (VWSC) / Pani Samiti, or Block Development Office to check your village Village Water Action Plan or report non-functional connections on ejalshakti.gov.in.

Ministry of Jal Shakti - Jal Jeevan Mission Portal · Application guidance checked 6 November 2026. This is separate from the full scheme review.

View saved schemes
What this scheme offers

Universal free or nominal-tariff rural household piped tap water connection providing 55 litres per capita per day (lpcd) of potable drinking water conforming to BIS 10500 standards, supported by ₹8.69 lakh crore mission outlay

Quick Facts
Run byMinistry of Jal Shakti
Checked by JanKosh6 November 2026

Get ready to apply

Keep track as you gather the documents listed in this guide.

Ticking a box is just a reminder for you. No files or document numbers are requested. Progress stays in this browser tab until its session ends.

0 of 1 items ready

The official portal may request additional or different documents. Check its current instructions and application window.

Check official application details

Jal Jeevan Mission supports safe and adequate drinking water through household tap connections in rural villages. Delivery is planned and implemented by states, with Gram Panchayats and village water committees involved in local operations. The Union Cabinet approved the Jal Jeevan Mission 2.0 extension through December 2028. This is a public service delivered locally, not a cash benefit with a national household application form.

Application dates

This scheme does not use a fixed application window.

JJM is a locally delivered public service rather than a time-limited individual grant application.

Benefits and conditions

Rural household tap water service

A functional household tap connection where covered by the local village water supply plan. Service status and coverage depend on the state and village implementation plan.

Who can apply

  • Connection coverage, functionality and service restoration are administered by the state, Gram Panchayat or local water provider.
  • There is no national individual cash application under JJM.
  • Rural household in a village covered by the state or local Jal Jeevan Mission plan

Required documents

  • Ask the Gram Panchayat or local water provider which household or connection records are needed for a local service request.

How to apply

  • Modes: Gram Panchayat, village water committee or state drinking-water department
  • Steps: Check village coverage and household connection status with the Gram Panchayat or state water department.
  • Steps: For a missing or non-functional connection, submit a local service request through the channel named by the village or state authority.
  • Steps: Use the official JJM dashboard to review reported village progress; dashboard figures do not replace local service confirmation.

Official application portal or instructions

Sources and claim verification

Claim-level source review

  • Union Cabinet approved Jal Jeevan Mission 2.0 extending the mission up to December 2028 with total outlay enhanced to ₹8.69 lakh crore (central share ₹3.59 lakh crore).

    Press Information Bureau - Cabinet approves Jal Jeevan Mission 2.0

    Document date: not stated; reviewed: 2026-11-06.

    Verified March 10, 2026 Cabinet approval extending timeline to Dec 2028 with ₹8.69 lakh crore outlay and introduction of Sujalam Bharat and Jal Arpan.

  • Service delivery benchmark set at 55 litres per capita per day (lpcd) of potable water conforming to BIS:10500 standards.

    Department of Drinking Water and Sanitation - JJM Guidelines

    Document date: not stated; reviewed: 2026-11-06.

    Confirmed 55 lpcd quantitative metric and Bureau of Indian Standards BIS 10500 quality standard.

  • Real-time village tap connection progress and water testing transparency provided via JJM Dashboard on eJalShakti.

    Ministry of Jal Shakti - JJM Integrated Management Information System Dashboard

    Document date: not stated; reviewed: 2026-11-06.

    Live public reporting portal for FHTC connections, district rankings, and water quality testing.

Frequently asked questions

Is Jal Jeevan Mission a direct cash transfer scheme or an individual subsidy application?

No. Jal Jeevan Mission is not a cash transfer scheme. It is a public infrastructure and service delivery programme where government departments execute piped water infrastructure to provide a Functional Household Tap Connection (FHTC) delivering 55 litres per capita per day of potable water to each rural household.

What is Jal Jeevan Mission 2.0 and until when has the mission been extended?

On March 10, 2026, the Union Cabinet approved Jal Jeevan Mission 2.0, extending the mission up to December 2028 and increasing the total outlay to ₹8.69 lakh crore (with ₹3.59 lakh crore central assistance). JJM 2.0 shifts the focus from initial pipeline construction to long-term potable water delivery, digital governance via 'Sujalam Bharat', source sustainability, and formal scheme handover to Gram Panchayats under 'Jal Arpan'.

Where can a rural resident verify tap connection status or register water supply grievances?

Citizens can check village-level coverage, water quality testing records, and school/Anganwadi tap connections on the national JJM Integrated Management Information System (IMIS) dashboard at ejalshakti.gov.in/jjmreport. Grievances regarding missing or dry tap connections should be lodged with the local Pani Samiti, Gram Panchayat secretary, or state rural water supply helpline.

PM-eBus Sewa Urban Mobility Scheme

A landmark urban transit scheme approved by the Union Cabinet on August 16, 2023, with an estimated total outlay of ₹57,613 crore, including ₹20,000 crore in central financial support from the Ministry of Housing and Urban Affairs (MoHUA). The scheme deploys 10,000 electric buses on a Public-Private Partnership (PPP) model across cities with a population of 3 lakh to 40 lakh (Census 2011), including all capital cities of Union Territories, North Eastern Region, and Hill States, prioritizing cities lacking organized public bus transport. The scheme operates in two segments: Segment A deploys 10,000 e-buses and provides operational support for 10 years alongside depot development and behind-the-meter power infrastructure in 169 cities; Segment B supports Green Urban Mobility Initiatives (GUMI) in 181 cities, covering bus priority corridors, multimodal interchange hubs, charging infrastructure, and National Common Mobility Card (NCMC)-compliant Automated Fare Collection Systems (AFCS).